Cone Zone
- Work will begin at the southern end of the corridor between Colorado Avenue and Boulder Creek Path this spring and continue through summer 2024. Travelers can expect single vehicle lane closures and the east side sidewalk of 30th Street to be closed
- Residence One will be the first new, modern housing building to open in the area, North Boulder Creek (NBC). It will house 332 upper division students in on-campus apartment-style housing. It will provide neighborhood amenities such as a café, UPS
- In 2021 a structural assessment of the building was completed by a structural engineer. A/E team is currently developing a design to address the recommendations of the report. The scope of work being evaluated consists of: a full structural
- On May 31, 2024, at 5 p.m. the Leonard H. Gemmill Engineering, Math & Physics Library, located in the Mathematics Building, will close for renovations. Our timeline for reopening right now is summer 2025. These renovations are needed to restore
- A major construction project is planned for the UMC in spring and summer 2026. Construction will improve the HVAC system, Campus Dining Services loading dock and pavement between the UMC and CASE buildings