Cone Zone
CU Boulder is constructing a new academic facility aimed at advancing research and educational opportunities in chemistry and applied mathematics on the southeast side of the Business School Field along Regent Drive on Main Campus. The facility will
Upcoming construction at the University Memorial Center will improve the heating, ventilation and air conditioning system; the Campus Dining & Hospitality loading dock; and pavement between it and the neighboring Center for Academic Success and
The ColderBoulder 5K will take place on Saturday, December 6, with runners on and around campus from approximately 5:30am until 2pm.The event will follow a course that loops through CU Boulder and surrounding streets. You can view the full course
Beginning the week of September 22 and running through mid-November, the City of Boulder will be making improvements to the medians on Broadway between College and Marine. These improvements will include installing new irrigation piping, planting
The CU Museum of Natural History in the Henderson building will be temporarily closed through the end of 2025 to align with the final phase of the Hellems renovation. Both buildings will reopen together at the end of 2025—refreshed and ready to
June 2, 2025 - June 2, 2027: All of the Business Field will be fenced off. There will be no access to the field for any events or pedestrian access.
Construction of the Colorado Highway 119 Safety, Mobility and Bikeway Improvements Project has started and will be ongoing through 2027. Once complete, the corridor will have improved bike and bus facilities, and safer and more efficient
Residence One will be the first new, modern housing building to open in the area, North Boulder Creek (NBC). It will house 332 upper division students in on-campus apartment-style housing. It will provide neighborhood amenities such as a café, UPS
A major construction project is planned for the UMC in spring and summer 2026. Construction will improve the HVAC system, Campus Dining Services loading dock and pavement between the UMC and CASE buildings