Family Housing Full map

Newton Court Zone

Newton Court mapNewton Court 1A, 2A - E, 2J - P, 2R - U

Ground level residents should evacuate to the second level of the building and shelter in place until instructed to leave. Shallow flooding expected during the 100-yr flood and 2 feet of flooding during a 500-yr flood.

Newton Court 2F, 2G

Ground level residents should evacuate to the second level of the building and shelter in place until instructed to leave. Shallow flooding expected during the 100-yr flood and up to 2.5 feet of flooding during a 500-yr flood.

Newton Court 2H

Ground level residents should evacuate to the second level of the building and shelter in place until instructed to leave. No substantial flooding expected during the 100-yr flood although water will surround the building. Shallow flooding is expected during a 500-yr flood.

Newton Court 2V, 2W, 2X

Ground level residents should evacuate to the second level of the building and shelter in place until instructed to leave. No substantial flooding is expected during the 100-yr flood although water will surround the building. 1 foot of flooding is expected during a 500-yr flood.

Newton Court 2Y

Ground level residents should evacuate to the second level of the building and shelter in place until instructed to leave. 2 feet of flooding is expected during the 100-yr flood and 3.5 feet of flooding is expected during a 500-yr flood

Newton Court L2 - L3

All occupants of the building should evacuate to the nearest Newton Court second level. Flood level expected to reach 1 foot during a 100-year flood and 3 feet during a 500-year flood.

Marine, Athens and Family Court Zones

Marine Court Map

Marine Court A

Ground Floor residents should evacuate to the second level of the building shelter in place until instructed to leave. No substantial flooding is expected during the 100-yr flood although water will surround the building. 1 foot of flooding is expected during a 500-yr flood.

Marine Court B - G

Ground Floor residents should evacuate to the second level of the building shelter in place until instructed to leave. Shallow flooding is expected during the 100-yr flood and 2 foot of flooding during a 500-yr flood.

Marine Court H - J

Ground Floor residents should evacuate to the second level of the building shelter in place until instructed to leave. No substantial flooding is expected during the 100-yr flood although water will surround the building. Shallow flooding is expected during a 500-yr flood.

Marine Court K

Ground Floor residents should evacuate to the second level of the building shelter in place until instructed to leave. Shallow flooding is expected during the 100-yr flood and 1 foot of flooding during a 500-yr flood.

Athens Court - B 1-3, A1 - 4, C1 -2 

Due to the proximity to Boulder Creek, all residents of Athens Court, regardless of their floor level should evacuate to the second level Marine Court. 

Family Court - FS

Due to the proximity to Boulder Creek and the structural integrity of Faculty Court, all Faculty Court residents, regardless of their floor level should evacuate to Athens North.

Athens North AN

Grade floor is not susceptible to any substantial amount of flood water from a 100 or 500-yr event although water will surround the building.

College Inn Conference CI

Debris impact poses a high risk to this building. Stay clear of external walls, windows and doors especially on the west side of the building. The first floor will experience flooding due to a 100-yr or 500-yr event. On the first floor, flood waters can be expected to reach a height of approximately 1.5 feet during the 100-year flood and 2 feet during the 500-year flood. Proceed to the fourth floor until water recedes.

Family Expansion Units FE

Due to the proximity to Boulder Creek and the structural integrity of the Family Expansion Units, all residents should evacuate to Athens North.