Amy Javernick-Will
- Javernick-Will, A. (2013). Engineering Management Journal. 25 (3), 16-26. doi: 10.1080/10429247.2013.11431979
- Alsamadani, R. , Hallowell, M., Javernick-Will, A., and Cabello, J. (2013). Journal of Construction Engineering and Management. 139 (9), 1125-1134. doi: 10.1061/(ASCE)CO.1943-7862.0000724
- Jordan, E. and Javernick-Will, A. (2013). Natural Hazards Review. 14 (1), 21-28. doi: 10.1061/(ASCE)NH.1527-6996.0000087
- A two-sided, laminated reference sheet explaining the appropriate uses and interpretations of three levels of project risk analysis. Includes descriptive samples of probabilistic risk analysis outputs, e.g., heat maps and tornado charts.Senesi, C.,
- Senesi, C., Javernick-Will, A., and Molenaar, K., Furlani, K. and Relyea, C. (2012). Construction Industry Institute. Austin, TX.
- Litchfield, K. and Javernick-Will, A. (2012).Institute of Electrical and Electronics Engineers Frontiers in Education Conference. Seattle, WA.
- Senesi, C., Javernick-Will, A., and Molenaar, K., Furlani, K. and Relyea, C. (2013). Construction Industry Institute. Austin, TX.
- Arnold, P. and Javernick-Will, A. (2013). Journal of Construction Engineering and Management. 139 (5), 510-518. doi: 10.1061/(ASCE)CO.1943-7862.0000596
- Molenaar, K., Javernick-Will, A., Bastias, A., Wardwell, M., and Saller, K. (2013). Journal of Management in Engineering, 29 (4), 327-333. doi: 10.1061/(ASCE)ME.1943-5479.0000149
- Kaminsky, J., Casias, C., Javernick-Will, A., and Leslie, C. (2012). Construction Research Congress. West Lafayette, IN. doi: 10.1061/9780784412329.208