Amy Javernick-Will
- Kaminsky, J. and Javernick-Will, A. (2013). Journal of Construction Engineering and Management. 139 (12), A4013004. doi: 10.1061/(ASCE)CO.1943-7862.0000757
- Senesi, C., Javernick-Will, A., Molenaar, K. (2013). Construction Industry Institute. Austin, TX.
- Litchfield, K. and Javernick-Will, A. (2013). Engineering Project Organization Conference. Granby, CO.
- Wanberg, J. and Javernick-Will, A., Taylor, J., and Chinowsky, P. (2013). Engineering Project Organization Conference. Granby, CO.
- Kaminsky, J. and Javernick-Will, A. (2013).Engineering Project Organization Conference, Granby, CO.
- Berteaux, F., Javernick-Will, A., and Chi, C. (2013). Engineering Project Organization Conference, Granby, CO.
- Javernick-Will, A. (2013). Engineering Management Journal. 25 (3), 16-26. doi: 10.1080/10429247.2013.11431979
- Alsamadani, R. , Hallowell, M., Javernick-Will, A., and Cabello, J. (2013). Journal of Construction Engineering and Management. 139 (9), 1125-1134. doi: 10.1061/(ASCE)CO.1943-7862.0000724
- Jordan, E. and Javernick-Will, A. (2013). Natural Hazards Review. 14 (1), 21-28. doi: 10.1061/(ASCE)NH.1527-6996.0000087
- A two-sided, laminated reference sheet explaining the appropriate uses and interpretations of three levels of project risk analysis. Includes descriptive samples of probabilistic risk analysis outputs, e.g., heat maps and tornado charts.Senesi, C.,