News & Updates
Noise Report & Map
Pleasant Street & Mackey Drive Parking Outage
Tuesday, March 26th at 10:00PM to Wednesday, March 27th at 7:00AM:
No parking at the (5) stalls on the South side of Macky Drive
Tuesday, March 26th at 10:00PM to Wednesday, March 27th at 7:00AM:
No parking on Pleasant Street between Broadway and Ramaley Building.
South Pedestrian Walkway Outage
Wed, March 27th at 6:00AM to Friday, March 29th at 6:00PM:
North section of pedestrian walkway will be closed and rerouted
Wed, March 27th at 6:00AM to Friday, March 29th at 6:00PM:
Pedestrian Reroute Path. No vehicle traffic along this path.
Lot 384 & Stadium Drive Partial Outage
Thursday, March 28th:5:00AM to 7:00AM: Stadium Drive Closed to pedestrian and vehicles for Crane Set Up thus no vehicle access in and out of Lot 386;
7:00AM to 1:00PM: Pedestrian and vehicle traffic will be periodically stopped during crane operation;
1:00PM to 3:30PM: Stadium Drive Closed to pedestrian and vehicles for Crane Take Down thus no access in and out of Lot 386
Thursday, March 28th: Lot 394 closed from 5:00AM to 4:00PM
Loss of Space (Week of January 28)
During the week of January 28th the following spaces will be impacted:
- The restrooms by the ice rink will be closed
- The passenger elevator will be closed. Patrons needing to use an elevator may use the freight elevator. Please use the phone outside the freight elevator for assistance.
- Access to the running track will only be from south stair case in expansion gym
- Conference Rooms 1-4 close
Southwest Addition Construction (Sat, Jan 19-Mon, Jan 28)
Fab Forms through Jan 19th
Lobby Roof Demo through Jan 19th
Sanitary Sewer Direction Bore through Jan 19th
Perimeter Drain through week of Jan 27th
Grade Beams/Foundation Walls/Concrete Work – Starts Jan 32st
Ice Rink Construction (Sat, Jan 19-Thurs, Feb 28)
Concrete Walls Ongoing through February
Underground Electrical – Jan 14th through Jan 27th
CMU Elevator/Stair Core – Starts Feb 4th
Locker Rooms Construction (Sat, Jan 19-Mon, Feb 11)
Subgrade Prep through Jan 27th
Underground Plumbing – Jan 21st through Feb 10th
Prep/Pour Slab – Jan 31st – Feb 11th
Site Demolition & Excavation (Mon, Dec 17-Mon, Dec 31)
Site Demolition/Excavation of the southwest addition will continue through the end of December. The demolition on the entry facade and roof as well as the concrete slabs and the locker room bases in the men's locker room will go through December 21.
Foundation/Concrete Work (Mon, Dec 17-Mon, Dec 31)
The progress on the ice rink is continuing to move forward. The foundation and concrete work will be ongoing through the end of December.
Excavation Phase to Begin (Thursday, November 1-Friday, December 14)
The excavation phase of the Rec Center renovation and remodel project begins next week, bringing increased truck traffic to the streets around the facility. During the week of November 1-Friday, November 9 expect high truck traffic on Folsom Street and Stadium Drive, as workers excavate near the location of the former tennis courts.
The Rec Center project is scheduled to start mass excavation at the new Southwest Addition of the Rec Center starting Tuesday, Nov 5th and will continue for a 6 week period. We are expecting approximately 50 – 80 trucks per day on Macky and Pleasant Street.
Signs will be posted prior to the excavation work. Please exercise caution in the area. The Rec Center renovation and remodel team appreciates the patience of campus during this disturbance.
Demolition Phase to Begin (Monday, November 5-Friday, November 23)
The demolition phase of the Rec Center renovation and remodel project will begin on Monday, November 5. This will bring increased noise levels to the building. Demolition will occur Monday-Friday between the hours of 7:30am-4:30pm. Below is the work schedule for demolition
The Rec Center will provide earplugs to both the student staff and patrons. There will be cases of earplugs at the cashier’s desk and a case at the checkout counter. The plugs are rated “33 decibels” of protection, meaning they can reduce noise by that amount when used as directed. The earplugs will be available starting Monday, October 29.
Rec Center Entrance Relocation
On October 11, 2012 the entrance to the Recreation Center will relocate to the East Gym of the Recreation Center (Facing Folsom Field).
Membership/Cashiers/Front Desk Relocation
On October 11, 2012 the front desk will move into the East Gym.
Cylce Studio Relocation
On October 11, 2012 the cycle studio will move to Racquetball Court #6.
Cardio Equipment Relocation
The equipment in the Cardio Room will be relocated to the General Gym by October 1, 2012.
The equipment in the Cardio Theater will be relocated to the General Gym by October 15, 2012.
Climbing Wall to Close
The climbing wall will close on October 15, 2012.
Outdoor Program Offices
The OP program offices have been relocated the first floor next to Checkout.
Timeline
October 2012
- Men's Locker Room Closes
- Front Desk, Cashiers, and Membership move to East Gym
- 2nd Floor Entrance & Lobby Closes
- Cardio Equipment Moves to General Gym
- Cycle Studio Moves to Racquetball Court 6
- Gender Inclusive bathroom closes
- Outdoor Program Offices move to checkout
- Climbing Wall Closes
- Adminstrative Offices move to Conference Room 5 & above pool
- Badminton & table tennis move to East Gym
January 2013
- Cybex System moves to General Gym
- Weight Room moves to General Gym
February 2013
- Conference Rooms 1-4 Close
April 2013
- Adminstration Offices move to UMC
- Competition Pool Closes - Lap swim moves to Carlson Pool
May 2013
- Current Ice Rink Closes
June 2013
- Racquetball Courts Close
- New Men's & Women's Locker Room Opens
August 2013
- New Ice Rink Opens
- Competition Pool Re-Opens
- Racquetball & Squash Courts Re-Opens
September 2013
- Climbing Wall & Outdoor Program Open
December 2013
- New Entrance/Lobby Open
- Weight & Cardio Rooms Open
- Administrative Offices Open
- New West Gym Opens
- Intramural & Club Offices Open
- Wellness Suite Opens
- Temporary Cardio, Weight, & System Areas Close
- Checkout Closes
- East Gym & Running Track Closes
March 2014
- Checkout, East Gym, & Track Re-Open
- Turf Gym Opens
April 2014
- Grand Opening
Office, Room, and Department Relocation Schedule
NEW FEATURES
Spacious LobbyThe Student Recreation Center will have a new entrance located on the southwest corner of the current facility. As patrons enter they will encounter a warm and inviting atmosphere complete with comfortable furniture, digital screeen displays, and large meeting areas. | ![]() |
Expanded Weight and Cardio SpaceThe Rec Center expansion will provide a 3 tiered level state of the art weight and cardio area, a lower level for free weights, and several additional spaces for cardio. | ![]() |
State of The Art
The bouldering wall is 120 linear feet crafted to accommodate a large volume of bouldering participants. The dedicated lead climbing section of the tall wall acsends to 38 feet and has all the key features of cracks, overhangs and beginner to advanced routes. | ![]() |
Fitness & WellnessThe Fitness & Wellness amenities will encompass a wellness suite, massage studio, private area for health screenings, and five fitness studios including mind body, indoor cycling, and functional training. | ![]() |
Ice Rink & Tennis CourtsThe new ice rink is a year round, cutting edge 200X85 sheet with stadium seating, surround system, overhead LED lighting, and a new refrigeration system. Amenities include priviate meeting rooms, skate rental, a warming area, and dedicated team locker rooms. Three tennis courts will be located on the roof of the ice rink with wind screens, lights, and great views of the Flotirons! | ![]() |
New Outdoor Aquatics & DeckThe Rec Center outdoor pool is a 25 yard, 2 lane, 3.6-4'deep, buffalo shaped leisure pool and deck for patrons. Pool amenities include a lounge chair sunbathing shelf, jetted area, water volleyball & basketball, water fountains, as well as plenty of social gathering space on the deck with gas grills, picnic areas, lounge chairs, and quiet bench areas in the terrace garden. | ![]() |
Indoor Turf Field |
Frequently Asked Questions
General Information |
Key elements of this project include:
|
Locker Rooms |
Bike Racks |
Bike racks have also been added to Lot 384 (north side of rec center). |
Outdoor Pool |