University Recreation Center Renovation and Expansion

                       

News & Updates

Noise Report & Map

Spaces that are now open:

  • Upper Gym
  • Strength & Cardio Rooms
  • Fitness Studios
  • Cycle & Rowing Studio
  • Ice Rink
  • Climbing Gym
  • Indoor Pools
  • Lower Gym
  • Indoor Running Track

Coming soon:

  • Turf Gym
  • Outdoor Pool & Deck
  • Tennis Courts

Timeline

 

October 2012

  • Men's Locker Room Closes
  • Front Desk, Cashiers, and Membership move to East Gym
  • 2nd Floor Entrance & Lobby Closes
  • Cardio Equipment Moves to General Gym
  • Cycle Studio Moves to Racquetball Court 6
  • Gender Inclusive bathroom closes
  • Outdoor Program Offices move to checkout
  • Climbing Wall Closes
  • Adminstrative Offices move to Conference Room 5 & above pool
  • Badminton & table tennis move to East Gym

January 2013

  • Cybex System moves to General Gym
  • Weight Room moves to General Gym

February 2013

  • Conference Rooms 1-4 Close

April 2013

  • Adminstration Offices move to UMC
  • Competition Pool Closes - Lap swim moves to Carlson Pool

May 2013

  • Current Ice Rink Closes

June 2013

  • Racquetball Courts Close

August 2013

  • New Men's & Women's Locker Room Opens

September 2013

  • Competition Pool Re-Opens

November 2013

  • Ice Arena Opens

January 2014

  • New Entrance/Lobby Open
  • Weight & Cardio Rooms Open
  • Administrative Offices Open
  • New Upper Gym Opens
  • Intramural & Club Offices Open
  • Wellness Suite Opens
  • Temporary Cardio, Weight, & System Areas Close
  • Checkout Closes
  • Lower Gym & Running Track Closes
  • Climbing Wall & Outdoor Program Open

February 2014

  • Racquetball Courts

March 2014

  • Equipment Services
  • Indoor Turf Field Opens
  • Squash Courts

April 2014

  • Lower Gym & Track Re-Open
  • Grand Opening

May 2014

  • Tennis Courts

Office, Room, and Department Relocation Schedule

Click here for PDF map

NEW FEATURES

Spacious Lobby

The Student Recreation Center will have a new entrance located on the southwest corner of the current facility. As patrons enter they will encounter a warm and inviting atmosphere complete with comfortable furniture, digital screeen displays, and large meeting areas.

Expanded Weight and Cardio Space

The Rec Center expansion will provide a 3 tiered level state of the art weight and cardio area, a lower level for free weights, and several additional spaces for cardio.
weight

State of The Art
Climbing Wall

The bouldering wall is 120 linear feet crafted to accommodate a large volume of bouldering participants. The dedicated lead climbing section of the tall wall acsends to 38 feet and has all the key features of cracks, overhangs and beginner to advanced routes.
rock

Fitness & Wellness

The Fitness & Wellness amenities will encompass a wellness suite, massage studio, private area for health screenings, and five fitness studios including mind body, indoor cycling, and functional training.
mind

Ice Rink & Tennis Courts

The new ice rink is a year round, cutting edge 200X85 sheet with stadium seating, surround system, overhead LED lighting, and a new refrigeration system. Amenities include priviate meeting rooms, skate rental, a warming area, and dedicated team locker rooms. Three tennis courts will be located on the roof of the ice rink with wind screens, lights, and great views of the Flotirons!

New Outdoor Aquatics & Deck

The Rec Center outdoor pool is a 25 yard, 2 lane, 3.6-4'deep, buffalo shaped leisure pool and deck for patrons. Pool amenities include a lounge chair sunbathing shelf, jetted area, water volleyball & basketball, water fountains, as well as plenty of social gathering space on the deck with gas grills, picnic areas, lounge chairs, and quiet bench areas in the terrace garden.

Indoor Turf Field

Frequently Asked Questions

General Information

Is the Rec Center open during construction?
The University Recreation Center will remain open during the entire construction process. Inevitably, there will be times in which certain areas of the building may have reduced access due to the construction process. Recreational Services will do its best to make sure patrons are informed as far in advance as possible.
When is the renovation starting?
The project started in June 2012.  Major construction will begin October 2012.
What is the scope of this project?
The project is to fully renovate and expand the existing Student Recreation Center, increasing the size of the center by nearly 30%.

Key elements of this project include:

  • Doubling Strength and Conditioning Spaces for drop-in weight & cardiovascular fitness training
  • Adding an Indoor Turf, Multi-Activity Gym for programmed and informal recreation
  • Adding an Outdoor Aquatics Facility & Deck Area
  • Replacing/Upgrading Building HVAC, Roof, Fire Suppression Systems and Access
  • Adding a Wellness & Athletic Training Suite for drop-in and program usage
  • Doubling Multi-Purpose Group Fitness Studio Space for a range of fitness classes, martial arts, and drop-in dance and fitness activities
  • Renovating all spaces for the general and special needs of students, including all locker/restrooms (also adding gender inclusive spaces), lobby and meeting spaces
  • Reconstructing the existing, failing Ice Rink and related systems
  • Renovating 2 existing Gyms, including adding new wood floor
  • Replacing the Outdoor Tennis Court
  • Building a state-of-the-art Climbing Gym with Bouldering Area
When will the expansion and renovation be finished?
Completion of major construction will be Spring 2014

Locker Rooms

Will there always be a locker room open during construction?
Yes! Temporary facilities will be provided by dividing the Women’s Locker Room while the new locker rooms are under construction.
Will I be able to rent a locker in the summer?
No, demolition of the men’s locker room and changes in the women’s locker during the renovation prevents the rental of summer lockers.
Will I be able to rent a locker in Fall 2012?
Yes, you can rent a locker in the Fall.  Only small lockers will be available until new locker rooms are complete.
How many showers will there be in the new locker rooms?
There will be 14 showers in the dry locker rooms, including 1 ADA shower and 9 showers with attached dry changing areas.

Bike Racks

Where have all of the bike racks been relocated?
Bike racks have been added to the Rec Center Entrance. We added (2) more racks near the main entrance where the concrete benches used to be. We also added (4) bike racks to the concrete pad between Lot 380 and the Rec Lawn.

Bike racks have also been added to Lot 384 (north side of rec center).

Outdoor Pool

What is the length/depth of the outdoor swimming pool?
The outdoor pool will have two standard 25 yard lap lanes ranging in depth from 3.5 to 4 feet.  In general, the outdoor pool will be 3.5 feet deep.
Will there be a rinse off space outside for the pool?
Yes, showers will be provided on the outdoor pool deck, adjacent to the pool.
Will the pool be open through the winter?
It is anticipated that the outdoor pool will be open in mid-April and will close for the winter in October.