A new campus pedestrian bridge is open for use, improving Americans with Disabilities Act access and overall connectivity between Main Campus and areas north of Boulder Creek.
Several gate arms will restrict private vehicle traffic to help safely move bike traffic off of sidewalks, reduce congestion on sidewalks and allow for easier physical distancing.
Weather permitting, Facilities Management Outdoor Services on Friday, June 5, will conduct broadcast spray applications on a pair of Colorado blue spruce trees infested with Douglas fir tussock moth larvae.
The Boulder Creek multiuse path near 19th Street and Grandview Avenue will be detoured for several months while crews work to restore the historic connection that was washed away in 2013 flooding.
Hey Buff fans: The CU basketball season is underway! The first home game will be on Nov. 16 with a tipoff time of 8 p.m. There are 32 scheduled games through Feb. 23, 2020, that will impact campus parking and traffic flow.
Avoid Foothills Parkway between Arapahoe Avenue and Baseline Road from 7 a.m. Saturday to 7 p.m. Sunday as crews remove the current pedestrian overpass, located south of Colorado Avenue.
Asphalt and concrete repairs along 18th Street on Main Campus and Innovation Drive on East Campus will cause single-lane closures on Aug. 8 and 9, and full closures on Aug. 10.
City of Boulder construction along Regent Drive next week will include lane closures. Elsewhere, the Central Campus Mall sidewalk will be closed for five hours on June 13 for crane work.
A boring operation on the east side of the JILA building next week will restrict access to the Duane Physics and Astrophysics lawn. Noise and vibration impacts also may be experienced nearby.