Pre-Operational Verification
Version 2010
Mechanical Commissioning Checklist Forms:
- Air Handling Unit
- Automatic Temperature Control
- Boiler
- Chilled Water and Specialties
- Chiller
- CHW Cooling Coils
- Condensing Water-Hydronic Piping and Specialties
- Cooling Tower
- Ductwork
- HW Heating Coils
- HW Heating-Hydronic Piping and Specialties
- Pump
- Steam and Condensate Piping
Electrical Commissioning Checklist Forms:
- Battery System
- Bus Duct
- Electrical Receptacles and Other Devices
- Emergency Generator
- Exterior Lighting
- Fire Alarm System
- Grounding System
- Isolated Grounding System
- KWH Meters
- Lighting System
- Medium Voltage Cables
- Medium Voltage Switch Gear
- Medium Voltage Switches-Breakers
- Medium Voltage Transformers
- Motor Control Centers
- Panel Boards
- Primary Grounding
- Secondary Transformers (Dry Type)
- Switchboards