Publications


Technical Reports

[ BACK ]

Diekmann, J. and Heinz, J., "Determinants of Jobsite Labor Productivity", Final Report for the Construction Industry Institute, January 2000.

Songer, A. and Diekmann, J., "Re-engineering the Engineering, Procurement and Construction Process", Final Source Document Report for the Construction Industry Institute, , June 1999.

Diekmann, J.E., "Project Control for Governmental Agencies: A White Paper" Technical Report to Center for Risk Analysis Oak Ridge National Labs, January 1998.

Diekmann, J.E., "EPRA - Environmental Project Risk Assessment", Technical Report to Center for Risk Analysis, Oak Ridge National Labs, December 1996.

Diekmann, J.E. and Sirulnik, D., " Cost Risk Analysis for SWMU 14 at the Pueblo Deport Activity", Technical Report to Rust Environment and Infrastructure, September 1996.

Diekmann, J.E., "Cost Risk Analysis for Environmental Restoration Projects", Technical Report to Center for Risk Analysis, Oak Ridge National Labs, August 1996.

Diekmann, J.E., Pecsok, R. and Sirulnik, D., "Final Report for Cost and Schedule Risk Analysis on DOE Hazardous Waste Remediation Projects", Technical Report to the Argonne National Laboratory, August 1995, 128 pages.

Diekmann, J.E. et al, " Procedural and Computational Studies for Cost Risk Analysis of DOE Hazardous Waste Remediation Projects", Technical Report to Argonne National Laboratory, January 30, 1995, 107 pages.

Diekmann, J.E. and Rodriguez-Guy, M., "Cost and Schedule Risk Analysis and Bayesian Updating of Hazardous Waste Remediation Projects", Technical Report to Argonne National Laboratory, April 24, 1995, 88 pages.

Diekmann, J.E., "Procedure for Cost Risk Analysis", Technical Manual, U.S. Army Corps of Engineers, Office of the Chief Engineer, Washington, D.C., August 1994.

Diekmann, J.E., and Featherman, David, "Formalized Quantification of Judgmental Uncertainty of Cost Risk Analysis of Hazardous Waste Remediation Projects", Final Report, U.S. Department of Energy, August 1994.

Diekmann, J.E., "DOE Environmental Remediation Cost Risk Analysis", Final Report, Department of Energy, Coalition to Increase Minority Degrees, May 1994.

Diekmann, J.E., Featherman, D. and Moody, R., "Cost Risk Analysis Models for DOE Hazardous Waste Projects, Final Report, U.S. Department of Energy, March, 1994.

Diekmann, J.E., Featherman, D. and Moody, R., "Cost Risk Analysis Models for Durango Project - UMTRA", Interim Report, U.S. Department of Energy, March 1994.

Diekmann, J.E., et al, "Cost Risk Analysis Models for DOE Hazardous Waste Remediation Projects", Department of Energy, Final Report, University of Colorado - Construction Research Series, February 1994.

Diekmann, J.E. and Girard, M., "DPI - Disputes Potential Index", Final Report, Construction Industry Institute, December 1993.

Diekmann, J.E., Featherman, D. and Moody, R., "Cost Risk Analysis Models for Lowman Project - UMTRA", Interim Report, U.S. Department of Energy, December 1993.

Diekmann, J.E., Featherman, D. and Moody, R., "Cost Risk Analysis Models for OU4 Solar Ponds Project - Rocky Flats", Interim Report, U.S. Department of Energy, November 1993.

Diekmann, J.E., "White Paper - Research Needs for the Construction Industry", Construction Industry Institute, November 1993.

Diekmann, J.E. and Abdul-Hadi, N., "Developing Work Breakdown Structures for HTRW Projects", Final Report U.S. Army Corps of Engineers, Construction Engineering Research Lab, Champaign, IL, September 1993.

Diekmann, J.E., Featherman, D. and Moody, R., "Cost Risk Analysis Models for OU2 Surface Water Treatment Project - Rocky Flats", Interim Report, U.S. Department of Energy, August 1993.

Diekmann, J.E., Featherman, D. and Moody, R., "Cost Risk Analysis Models for 881 Hillside Project - Rocky Flats", Interim Report, U.S. Department of Energy, July 1993.

Diekmann, J.E., "Cost and Schedule Risk Analysis Guidance Document", Technical Report to U.S. Army Corps of Engineers, Office of the Chief Engineer, Washington, D.C., January, 1993.

Diekmann, J.E. and Baker, Gary, "EPA/Corps of Engineers Joint Guidance Document Cost Risk Analysis for HTW Remediation Projects", Technical Report to US Environmental Protection Agency, Office of Emergency and Remedial Response, Washington D.C., November 2, 1992.

Diekmann, J.E., "Modeling the Impacts of Short Schedule Durations on Project Performance", Technical Report to the Swedish Construction Employers Council, Stockholm, Sweden, April 24, 1991.

Diekmann, J.E. and Rotar, M., "Evaluation, Testing and Modification of SuperChange", Technical Report to U.S. Army Corps of Engineers Construction Engineering Research Labs, Construction Research Series #13, University of Colorado-Boulder, Boulder, Colorado, December, 1990.

Diekmann, J.E., "Computer Assisted Project Planning in the Construction Industry: Lessons for DYCAM Developers", Technical Note #51, Center for Space Construction, University of Colorado-Boulder, Boulder, Colorado, May, 1990.

Morganthaler, G., Diekmann, J.E., et. al., "Research on Computer Aided Systems Engineering for Space Construction", SSC System Report #16, Center for Space Construction, University of Colorado-Boulder, Boulder, Colorado, May, 1990.

Diekmann, J.E. and Dagli, D., "SuperChange: An Expert System for Contract Changes", Technical Report to U.S. Army CERL, January 1990, 150 pages.

Diekmann, J.E., et al., "Development of an Expert System for Planning Design and Cost Estimating of Pipelines" (A Joint Report with The U.S. Bureau of Reclamation), October 1989, 50 pages.

Diekmann, J.E. and Kraiem, Z., "DISCON: A Microcomputer Based Expert System for Differing Site Conditions", Final Report to the National Science Foundation, Washington, D.C., Grant No. MSM-8415257, June 1988, 15 pages.

Diekmann, J.E. and Ivanoff, Daniel, "Project Labor Agreements in the Construction Industry", Technical Report to the Associated Builders and Contractors, Denver, Colorado, April 1987, 316 pages.

Diekmann, J.E., "An Expert System for Construction Management", An Interim Progress Report to the National Science Foundation, Washington, D.C., Grant No. MSM-8415257, November 1986, 15 pages.

Diekmann, J.E. and Bloom, J., "Prevailing Wage Survey Techniques for Larimer County, Colorado", for the Associated Builders and Contractors, Denver, Colorado, August 1986, 200 pages.

Diekmann, J.E. and Thrush, K.B., "Project Control in Design Engineering", Technical Report to the Construction Industry Institute, Austin, Texas, December 1985, 230 pages.

Diekmann, J.E. and Al-Assaf, A.M., "Improvement of the Construction Cost-Effectiveness of the Ministry of Defense and Aviation - Kingdom of Saudi Arabia (Executive Summary)", Technical Report to the General Directorate of Military Works - MODA - KSA, Riyadh, Saudi Arabia, September, 1985, 20 pages.

Diekmann, J.E. and Al-Assaf, A.M., "Improvement of the Construction Cost-Effectiveness of the Ministry of Defense and Aviation - Kingdom of Saudi Arabia", Technical Report to the General Directorate of Military Works - MODA - KSA, Riyadh, Saudi Arabia, September, 1985, 254 pages.

Diekmann, J.E., Sture, S. and Yousef, A., "Superconducting Super Collider Civil Engineering Task Report", Technical Report to Colorado SSC Siting Committee, Denver, Colorado, April, 1985, 86 pages.

Diekmann, J.E. and Yousef, Ali, "Construction Markets-1988", Technical Report to Phelps, Inc., Greeley, Colorado, November 1983, 138 pages.

Diekmann, J.E., "Contract Disputes and Computer Reasoning: An Artificial Intelligence Approach to Claims Resolution", Technical Report to the U.S. Army Corps of Engineers' Construction Engineering Research Labs, Champaign, Illinois, September, 1983, 23 pages.

Diekmann, J.E. and Moore, D.E., "Growth of Open Shop Construction in Colorado", Technical Report to the Construction Industry Management Council and the Colorado Building and Construction Trades Council, Denver, Colorado, March 1983, 133 pages.

Diekmann, J.E., "Risk Assessment in Cost Estimating Techniques", Technical Report to the Solar Energy Research Institute, Golden, Colorado, August 1982, 98 pages.

Diekmann, J.E. et al., "An Investigation of the Economic and Technical Feasibility of the Madaras Power Plant Concept", Technical Report to the Solar Energy Research Institute, Golden, Colorado, August 1981, 116 pages.

Diekmann, J.E., "Selection of Cost-Plus Contractors Using Normative Decision Methodologies", Unpublished doctoral dissertation, University of Washington, 1979, 472 pages.

 