An April dusting of snow left us with a white airfield.
The team goes right to work clearing tables for planes.
Every available shovel, broom, and person went to work clearing the runway!
The design iteration of the linear actuator mount.
This flight was equipped with a video camera inside of the PV.
The snow required proper electrical component protection.
Start up the system!
Out on the runway.
System in flight.
Deployment of an SV.
An SV falls away from the plane, and ends up upside down.
More deployment sequences.
Deployment!
Another SV deploys!
Falling away from the system.