The first vibration test on the shaker table.

The set-up on the shaker table.

James, Leah, Scott, and Travis set up.

Travis, Leah, and James attach the deployment mechanism to the shaker.

Matt helps prepare lights for the high-speed camera.

Travis tests the lights for the high-speed camera.

The team prepares for a trial.

Leah, Travis, and Matt set up the high-speed camera.

The team sprawls out in the basement of the ITLL.

Matt and Jeff capture high-speed footage with Leah and James.

The intense lights help capture high-speed footage of the aircraft vibrations.