|
|
|
CU Lunar Module and Analog Research Station (LunarMARS) Program |
|
o
Home o
Overview o
Photo Album |
|
Bioastronautics Research Group in the Lunar Lander Mockup (December 2008)
(left) Lunar Lander Design Team (spring 2008) with NASA Astronaut Joe Tanner and (right) CU Aerospace Sophomore, Brock Kowalchuk, Dean’s Discovery Learning Apprenticeship Program (fall 2008)
Habitat Prototype (hatch and interior outfitting beginning)
Hatch Configuration Study Suit Stowage Rack
Habitat Prototype (exterior, flight deck end) Habitat Prototype (interior, not yet outfitted)
Window Panel Installation Modular Framework Assembly
CBS Ch 4 News Interview (watch it!) MS Projects Pilot Class, Spring 2007
Spacesuit-to-Vehicle Interface Eval
K-12 and Community Outreach Events
Project Conception / Pre-Prototype
Development (ca. December 2006) |
|
|
|
|